The Flare Systems, Combustion Units and Incinerator Packages manufactured by COMES are fabricated in accordance with the customer’s design engineering.
We offer custom-build Flare Systems made of:
Flare control systems and auxiliary equipments are out of our scope. Trial fitting is made during fabrication.
COMES designs and builds also complete lines of Combustion Units consisting of:
The Claus Reaction Furnace may be welded directly to the Waste Heat Boiler with the Syeam Drum sitting above.
Incinerator packages are also fabricated, tested and fully assembled in accordance with client technical documentation. Execution of incinerator projects consists of the following equipments:
The Combustion Chamber shall be welded directly to the Waste Heat Boiler with the Steam Drum sitting above.
COMES scope of supply may include CE marking of completed assembly.
Refractory shall be done by others, but welding of sprags and any attachments to vessel shall be done in house, prior to hydrotesting and painting.
All equipments shall be in accordance with PED 2014/68/EU regulations.
Location: Cairo, Egypt
February 17-19, 2025
Visit us at Booth 3L28, where we will be delighted to present the latest technologies and innovative solutions for the oil & gas industry.
We look forward to meeting you and helping you discover our products and services!